![]() Re-tapping the bottom bracket. As with all steel frames the threads get full of flux, paint and brass. |
![]() Installing the bb inserts to face the bb shell. |
![]() Facing the shell to make sure the surface is square. |
![]() Installing the bb. |
![]() Time to tap out the hanger to 10x1. |
![]() Tap out the water bottle mounts .5x.8. |
![]() Cutting and facing the headtube. |
![]() Installing the headset. |
![]() Reaming out the seat tube, sorry about the picture. |
![]() Cleaning up the treads on the steerer tube. |
![]() Cutting down the fork. |
![]() Back in the box it came in. |